Current work value
People, hours, shifts, days, weeks, and loaded hourly cost show the annual value of the repeat work you are assessing.
Start with the work you want to automate and how it runs today. Add a working budget if you have one to see a simple payback estimate.
Nothing entered here is sent to Uru Robotics.
1. The task
2. The working pattern
3. A budget, if you have one
A useful system cost includes the robot or vehicle, process equipment, tooling, fixtures, safeguards, installation, and integration. Uru confirms that scope after reviewing the task.
Choose the task and add the current working pattern to see a first estimate.
Talk to us about a system estimateThe first result values the repeat manual work today. It is a starting point for a business case, not a price or a return promise.
People, hours, shifts, days, weeks, and loaded hourly cost show the annual value of the repeat work you are assessing.
Add a working budget and the tool compares it with the annual work value. The result is a simple payback period, not a final investment case.
The automation task is only the starting point. The complete cost depends on the equipment, access, tooling, safety, hand-off, and integration around it.
Count the work that genuinely repeats. Do not treat all manual time as work that can move into a system.
What the tool can estimate before a system has been scoped.
It estimates the annual value of the manual work you enter. If you add a working system budget, it also calculates a simple payback period on that labour-capacity value.
The task provides context for the conversation and the system scope. It does not create an automatic Uru system price.
A system cost depends on the task and the complete scope around it: equipment, tooling, fixtures, safeguards, installation, and integration. Uru Robotics does not publish a price range without that review.
No. It is a planning estimate from your own inputs, not a price or a return promise.
The full hourly cost of the work being assessed, not the wage alone. Include the employment costs you normally carry alongside it.
Where to go once you have a rough number.
Bring your figures and the production task behind them.